| | | Topic | Topic Starter | Replies | Views | Rating | Last Post |
 |  | Chapter 7 of the 2006 IBC- key points | GoodEngr | 2 | 168 |  |
by needtolearn |
 |  | asymetrical interior wall construction | HENCHALWOOG | 8 | 80 | |
by hil_CA |
 |  | Type VA and Sprinkler Substitution | rlga_AZ | 1 | 17 | |
by Jim Fruit |
 |  | Questions in Chapter 7A CBC | Tom Carleton | 10 | 118 | |
by CCHARR |
 |  | 2001 CBC (1997 UBC) Table 6-A Questions | eastbay | 5 | 53 | |
by eastbay |
 |  | Dampers etc in a 2hr Floor Clg Assembly 2006 IBC | dexterdancer | 4 | 37 | |
by Jim Fruit |
 |  | IRC 302.1 projections | boulder | 1 | 24 | |
by Mr. AIA |
 |  | Elevator machine room - fire barrier | manincellv | 5 | 49 | |
by rlga_AZ |
 |  | 2001 CBC, Rated shaft or Not? | Daniel A Garcia_ Fresno | 3 | 49 | |
by Jim Fruit |
 |  | Mixed items in a rated shaft | Archidink | 0 | 22 | |
|
 |  | Fire rated windows | crazychuck01 | 2 | 41 | |
by crazychuck01 |
 |  | 2-story elevator shaft need to be one hour rated? | Wayne | 11 | 747 | |
by Stu_SLO |
 |  | Wood stud sizes (substitution in a rated wall assembly) | Bbobarch | 2 | 55 | |
by GaryO |
 |  | Fire-retardant-treated-lumber (is that considered noncombustible material)? | Bbobarch | 3 | 44 | |
by rlga_AZ |
 |  | Stairway Enclosure Exiting Through Lobby That Opens to the 2nd Story | Annette | 1 | 33 | |
by rlga_AZ |
 |  | Fire rated Floor Assembly | Underdog | 1 | 48 | |
by DW |
 |  | Deluge Sprinklers | MSMontgomery | 3 | 49 | |
by cda |
 |  | 2007 CBC - Fire rating for existing SC wd doors | ACP | 6 | 119 | |
by mikeelia |
 |  | Draftstop Requirements | Greg Frank | 1 | 79 | |
by Jim Fruit |
  |  | Residential Spray-applied fire-resistants | Randy Dube | 1 | 33 | |
by Jim Fruit |
 |  | corridor used as return air plenum | HENCHALWOOG | 2 | 39 | |
by mikeelia |
 |  | Exterior protection of balcony columns | HENCHALWOOG | 2 | 49 | |
by HENCHALWOOG |
 |  | Type V-A roof penetration | HENCHALWOOG | 0 | 20 | |
|
 |  | Corridor - Electrical, Plumbing and Garbage closet doors need to be metal? | rmejia | 3 | 48 | |
by HENCHALWOOG |
 |  | 2001 CBC, Raised Platform/Floor | Daniel A Garcia_ Fresno | 0 | 27 | |
|
 |  | Lobby open to 2nd floor - "Shaft" | Glen | 3 | 43 | |
by Glen |
 |  | Separate occupancies in 2-story building facing property line | CodeQPoster-ISN | 2 | 42 | |
by CodeQPoster-ISN |
 |  | Parapet code question. | archited | 3 | 71 | |
by Jim Mack_modesto |
 |  | grease duct shaft | Jon_Sacramento | 4 | 58 | |
by Kal2 |
 |  | Pentrations in Exterior Walls | Glen | 4 | 59 | |
by Glen |
 |  | Q1. Are enclosures provided around elevator or other shaft openings, which penetrate only one floor required to be of fire-resistive | Kal2 | 3 | 60 | |
by rlga_AZ |
 |  | California State Fire Marshal Code Interpretation of 2007 CBC 716.5.4 and 716.5.4.1 (Corridor Penetration in SFM Requlated Occupancies) | Kal2 | 0 | 12 | |
|
 |  | Private garage separation from habitable space above- 2006 IBC, Section 406.1.4 | CodeQPoster-ISN | 3 | 72 | |
by Left Coast Architect |
 |  | does "assembly" mean fire rated? | HENCHALWOOG | 5 | 82 | |
by rlga_AZ |
 |  | Windows in Exit stair | Robbob | 1 | 45 | |
by the codeyman |
 |  | Is fabric classified as a roof ? | Budi | 8 | 74 | |
by Budi |
 |  | Four-hour rated wall (steel studs + gysum wallboard) 2007 CBC | CodeQPoster-ISN | 0 | 17 | |
|
 |  | Air Space Between Walls | TERICHARDSON | 0 | 18 | |
|
 |  | IBC 2603.4.1.6 attics and crawl spaces | teddie | 1 | 31 | |
by Jim Fruit |
 |  | spring hinges on residential fire doors? | tlbrooks | 4 | 51 | |
by Jon_Sacramento |
 |  | Exceeding openings limit in exterior wall- Table 704.8 | CodeQPoster-ISN | 1 | 44 | |
by Left Coast Architect |
 |  | Openings in exterior wall- Table 704.8, 2007 CBC | CodeQPoster-ISN | 1 | 43 | |
by Left Coast Architect |
 |  | calculated fire resistance of existing construction materials | arctec | 4 | 46 | |
by rlga_AZ |
 |  | Fire dampers, smoke dampers, ceiling radiation dampers- where required in the 2006 IBC? | the codeyman | 2 | 77 | |
by needtolearn |
 |  | mech shaft rated or not in type ll B non rated bldg | Naveed | 2 | 27 | |
by GoodEngr |
 |  | Fire blocking required in 3-inch air space between new and existing? 2001 CBC (1997 UBC) | CodeQPoster-ISN | 2 | 44 | |
by Jon_Sacramento |
 |  | No exterior 2x6 wood wall rating? Plaster-PWD-2x6-GWB | John N | 17 | 164 | |
by hil_CA |
 |  | electrical boxes in spray on fire proofing | JMCDANIEL | 0 | 14 | |
|
 |  | Wood-Frame Balconies | phamja | 4 | 72 | |
by Annette |
 |  | 704.8 Allowable area of openings | LDJnx | 2 | 45 | |
by needtolearn |
 |  | Foundation vents in exterior walls that are rated- 2007 CBC | the codeyman | 1 | 47 | |
by GoodEngr |
 |  | Addressing obstructions found in fire rated shaft for grease duct | Irving | 0 | 17 | |
|
 |  | Is shaft enclosure required? | t-bone | 0 | 38 | |
|
 |  | Multi-Purpose Shaft | MSMontgomery | 1 | 25 | |
by rlga_AZ |
 |  | Table 715.5 Fire Window Assembly CBC2007 | Paul N. Miller | 4 | 75 | |
by Paul N. Miller |
 |  | Rated CMU Parapet with Pressure Treated Nailer | Dan Allen | 5 | 67 | |
by Dan Allen |
 |  | IBC Shaft Enclosures Section 707 | Micro Mike | 4 | 143 | |
by needtolearn |
 |  | Door in smoke partition - needs a bottom seal? | DwightB | 0 | 23 | |
|
 |  | 1 hour ceiling assembly | Bretc | 2 | 80 | |
by M. Handler,Architect |
 |  | fire rating at Type VA construction. | AC | 1 | 57 |  |
by rlga_AZ |
 |  | fire wall in a non-rated building | mfine | 3 | 67 | |
by rlga_AZ |
 |  | Exterior Wall and Projection Fire Rating per 2006 IRC | PeterT | 0 | 42 | |
|
 |  | 2007 CBC Shaft Enclosures in R occ | Stu_SLO | 10 | 143 | |
by rlga_AZ |
 |  | Protected Structure Required? | MSMontgomery | 0 | 31 | |
|
 |  | 07 CBC shafts... | Jon_Sacramento | 12 | 215 | |
by the codeyman |
 |  | door lights | super | 2 | 49 | |
by rlga_AZ |
 |  | What's wrong with this design? | codeman | 6 | 171 | |
by rlga_AZ |
 |  | 2-hour floor components | hil_CA | 17 | 135 | |
by BrentWiese |
 |  | Louvers in fire rated doors | Tom Butt | 2 | 57 | |
by code resource |
 |  | Floor/Ceiling Rating Compliance Issue | hil_CA | 3 | 78 | |
by hil_CA |
 |  | door /window rating in rated walls | Naveed | 4 | 113 | |
by Naveed |
 |  | Fire Damper Required? | 3509ra | 1 | 79 | |
by the codeyman |
 |  | 2002 CBC floor separtion | clynnjw | 4 | 50 | |
by clynnjw |
 |  | Height increase - "Fire Areas" 504.2.1 | Geoff | 4 | 65 | |
by Geoff |
 |  | Bath in garage | MurphNC | 3 | 113 | |
by CCHARR |
 |  | 1-hr rated beam in type V-1hr construction | nancyy | 6 | 126 | |
by ADAguy |
 |  | Structural Fire Protection- common questions answered. | GoodEngr | 0 | 76 |  |
|
 |  | 2 hour floor/ceiling v. plumbing penetration | hil_CA | 15 | 144 | |
by hil_CA |
 |  | Heavy Timber Requirements | CSCS_oakhurst | 2 | 74 | |
by RiceAssociates |
 |  | 1 hour rated corridor & glazing per CBC 2007 | alexreynoso_salinas | 2 | 83 | |
by alexreynoso_salinas |
 |  | New Flame and Ember Resistant Vents-2007 CBC, Ch 7A | Brandguard Vents | 0 | 57 | |
|
 |  | Draft Stops Required or Not? | Daniel A Garcia_ Fresno | 4 | 102 | |
by Daniel A Garcia_ Fresno |
 |  | Air Barrier at top of Party Wall | KJJ | 2 | 47 | |
by KJJ |
 |  | Exterior walls- Section 709.3.1 in 2001 CBC..what happened in 2007 CBC? | CodeQPoster-ISN | 3 | 134 | |
by bjs-aia |
 |  | Individual Protection of Microlam Beams | code nomad | 1 | 52 | |
by needtolearn |
 |  | Pedestrian Bridge Separtion | Glen | 0 | 27 | |
|
 |  | draftstop requirement for roof cavity | peterspellman | 7 | 121 | |
by peterspellman |
 |  | T rating for podium floor penetrations | Fozz | 1 | 31 | |
by PatrickB |
 |  | plumbing penetrations in 1-hr floor ceiling | peterspellman | 1 | 103 | |
by batwood |
 |  | SHAFT enclosure at bottom floor | KeithF | 1 | 48 | |
by the codeyman |
 |  | openings in relation to an arcade | M. Handler,Architect | 1 | 31 | |
by planman88_Eureka,CA |
 |  | Vinyl windows and tempered glass | cmjt | 2 | 79 | |
by planman88_Eureka,CA |
 |  | Deflection Track Required? | BC | 1 | 49 | |
by M. Handler,Architect |
 |  | Kraft-faced insulation | grev | 4 | 58 | |
by grev |
 |  | penetration firestop in 3hr rated podium | maxinewarwick | 4 | 82 | |
by Builder Bob |
 |  | 1-hr fire rated column in concrete wall | Stu_SLO | 3 | 87 | |
by Stu_SLO |
 |  | IBC Table 704.8 and Angled Walls | rlga_AZ | 3 | 119 | |
by needtolearn |
 |  | Is 1 hour barrier the same for Structural Insulated Panels? | kevin@greenwall.us | 4 | 65 | |
by ADAguy |
 |  | RATED ASSEMBLIES | Bill Leonard | 17 | 278 | |
by hil_CA |
 |  | Thermoplastic Resin siding vs fiber cement? | ADAguy | 1 | 32 | |
by ADAguy |