| | | Topic | Topic Starter | Replies | Views | Rating | Last Post |
 |  | Floor/Ceiling Rating Compliance Issue | hil_CA | 3 | 47 | |
by hil_CA |
 |  | Penetrations of 1 hr rated walls | spott | 0 | 27 | |
|
 |  | door /window rating in rated walls | Naveed | 4 | 68 | |
by Naveed |
 |  | 1 hour ceiling assembly | Bretc | 0 | 23 | |
|
 |  | 2-story elevator shaft need to be one hour rated? | Wayne | 10 | 651 | |
by the codeyman |
 |  | Fire Damper Required? | 3509ra | 1 | 54 | |
by the codeyman |
 |  | 2002 CBC floor separtion | clynnjw | 4 | 45 | |
by clynnjw |
 |  | Height increase - "Fire Areas" 504.2.1 | Geoff | 4 | 55 | |
by Geoff |
 |  | Bath in garage | MurphNC | 3 | 96 | |
by CCHARR |
 |  | 1-hr rated beam in type V-1hr construction | nancyy | 6 | 102 | |
by ADAguy |
 |  | Structural Fire Protection- common questions answered. | GoodEngr | 0 | 36 | |
|
 |  | 2 hour floor/ceiling v. plumbing penetration | hil_CA | 15 | 130 | |
by hil_CA |
 |  | Heavy Timber Requirements | CSCS_oakhurst | 2 | 63 | |
by RiceAssociates |
 |  | 1 hour rated corridor & glazing per CBC 2007 | alexreynoso_salinas | 2 | 53 | |
by alexreynoso_salinas |
 |  | New Flame and Ember Resistant Vents-2007 CBC, Ch 7A | Brandguard Vents | 0 | 41 | |
|
 |  | Draft Stops Required or Not? | Daniel A Garcia_ Fresno | 4 | 80 | |
by Daniel A Garcia_ Fresno |
 |  | Air Barrier at top of Party Wall | KJJ | 2 | 39 | |
by KJJ |
 |  | Exterior walls- Section 709.3.1 in 2001 CBC..what happened in 2007 CBC? | The code Qs poster | 3 | 104 | |
by bjs-aia |
 |  | Individual Protection of Microlam Beams | code nomad | 1 | 41 | |
by needtolearn |
 |  | Pedestrian Bridge Separtion | Glen | 0 | 23 | |
|
 |  | 07 CBC shafts... | Jon_Sacramento | 10 | 156 | |
by hil_CA |
 |  | draftstop requirement for roof cavity | peterspellman | 7 | 103 | |
by peterspellman |
 |  | T rating for podium floor penetrations | Fozz | 1 | 26 | |
by PatrickB |
 |  | plumbing penetrations in 1-hr floor ceiling | peterspellman | 1 | 97 | |
by batwood |
 |  | SHAFT enclosure at bottom floor | KeithF | 1 | 44 | |
by the codeyman |
 |  | openings in relation to an arcade | M. Handler,Architect | 1 | 26 | |
by planman88_Eureka,CA |
 |  | Vinyl windows and tempered glass | cmjt | 2 | 66 | |
by planman88_Eureka,CA |
 |  | Deflection Track Required? | BC | 1 | 42 | |
by M. Handler,Architect |
 |  | Kraft-faced insulation | grev | 4 | 49 | |
by grev |
 |  | penetration firestop in 3hr rated podium | maxinewarwick | 4 | 76 | |
by Builder Bob |
 |  | 1-hr fire rated column in concrete wall | Stu | 3 | 79 | |
by Stu |
 |  | IBC Table 704.8 and Angled Walls | rlga_AZ | 3 | 98 | |
by needtolearn |
 |  | Is 1 hour barrier the same for Structural Insulated Panels? | kevin@greenwall.us | 4 | 59 | |
by ADAguy |
 |  | RATED ASSEMBLIES | Bill Leonard | 17 | 237 | |
by hil_CA |
 |  | Thermoplastic Resin siding vs fiber cement? | ADAguy | 1 | 29 | |
by ADAguy |
 |  | Does this need to be fire rated (stair landing within stairway enclosure)? | Matt K | 2 | 66 | |
by Matt K |
 |  | Intersection of non-rated wood framed partition with 1-hour ceiling membrane | Slammer | 1 | 38 | |
by Dave Robertson |
 |  | Overhang protection, eave vents in 1HR fire-rated buildings (UBC & IBC) | admin | 8 | 781 |  |
by M. Handler,Architect |
 |  | 1 hr roof asembly | Seba | 4 | 67 | |
by M. Handler,Architect |
 |  | Do the exterior walls of stair need to be 2 hour? | tguthrie | 0 | 30 | |
|
 |  | Fire rating required for pier and beam floor? | Tod | 1 | 30 | |
by Glen |
 |  | UL v ASTMK v IBC | lynxlooo | 1 | 25 | |
by 3509ra |
 |  | Code exemptions for composite materials | Ray1 | 0 | 26 | |
|
 |  | Vinyl siding, type III construction? | WDH | 1 | 40 | |
by BarryG |
 |  | TJI and rated floor assembly | HENCHALWOOG | 3 | 46 | |
by M. Handler,Architect |